This lecture explains the standard step-by-step procedure for testing Electronic Navigational Charts (ENC) using dKart Inspector. The process is designed to ensure full compliance with S-57 and S-58 standards and includes:
- Loading the ENC and updates
- Reviewing the loader report
- Manually applying and verifying updates
- Running automated validation tests
- Analyzing the final test report
Each stage plays a critical role in identifying errors, validating data structure, and maintaining chart quality before operational use in ECDIS systems.